Multiple Buildings Roof Replacement

This project consists of roof replacements to 930 Madison Building, Student Alumni Center, Link Building, Hyman Building, Johnson Building, Wittonborg Building, and Plough Center/GMP Building. The project includes the removal of existing roof systems, including existing insulation, crickets, flashing; install new modified bitumen roof system and all related work. Where noted, existing gutters, downspouts, scuppers, and coping will be replaced.

Status

Bidding Closed

Prebid Date1/5/23 2:00pm

Bid Date1/26/23 2:00pm

Company & Contacts

Nickson General Contractors, Inc.
Bobby Potts  
901-456-0548

Location

The University of Tennessee Health Science Center, Memphis, Tennessee

Bid Information:

Please submit all bids and bidding questions to Bobby Potts, bobby@nicksongeneral.com

The University of Tennessee Health Science Center at the Physical Plant Training Room #239, 201 East Street, Memphis, TN 38163 & via Zoom, please see details below.

Bids will now be received until 2:00pm on January 26, 2023.


Pre-Bid Information:

The University of Tennessee Health Science Center at the Physical Plant Training Room #239, 201 East Street, Memphis, TN 38163 & via Zoom, please see details below.

At 2:00 pm, local time on January 5, 2023

Join from PC, Mac, Linux, iOS or Android:

https://tennessee.zoom.us/j/93424462635?pwd=R1NaREdZbWtmMStMczE2RVlRdkZaUT09

Password: 638916


Hard copy sets of plans and specifications are available for purchase at contractor's expense, or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.